Services

Industrial Waste Management

End-to-end industrial waste management, from on-site assessment and segregation to treatment and compliant disposal — reducing environmental impact and increasing reuse and recycling.

Hazardous waste

All hazardous waste goes through a systematic workflow of segregation, transformation and treatment to reduce its hazardous characteristics and environmental impact, before final disposal through licensed incineration or secure landfill in full compliance with legal and environmental standards.

Waste types we handle

  • Fluorescent lamps and light bulbs
  • Batteries
  • Electronic waste (e-waste)
  • Chemical-contaminated containers
  • Contaminated materials
  • Aerosol cans
  • Paint sludge and contaminated rags
  • Other hazardous waste
Hazardous waste

Non-hazardous waste

Non-hazardous waste is segregated, transformed and recycled to reduce the volume requiring final disposal and improve resource efficiency. What cannot be recycled is used to produce waste-derived fuel (SRF / RDF) or disposed of at licensed incineration or landfill facilities.

Waste types we handle

  • Paper
  • Plastics
  • Rubber waste
  • Glass fragments
  • Filter bags
  • Conveyor belts
  • Other non-hazardous waste
Non-hazardous waste

Scope of work

  • Segregation and transformation of industrial waste in dedicated areas
  • Alternative fuel, blended fuel and Solid Recovered Fuel (SRF) production
  • Lamp and aerosol-can recycling
  • Shredding of electronic equipment components
  • Battery collection

Work Process

Regulatory workflow (Gor.Or.2 manifest)

Management of hazardous and non-hazardous industrial waste in accordance with the Ministry of Industry Notification on the Management of Waste or Unused Materials B.E. 2566 (2023).

1Waste Generator (WG)

  1. System data reporting and submission
  2. Prepare Form Gor.Or.2
  3. WG sign-off for waste removal (Part 1)

2Waste Transporter (WT)

  1. Verification of details
  2. WT sign-off for transportation (Part 2)
  3. WG submits supporting photos for Gor.Or.2

3Waste Processor (WP)

  1. Incoming vehicle information
  2. WP confirms vehicle arrival (Part 3/1)
  3. Fingerprint verification
  4. WP approves acceptance (Part 3/2)
  5. WP sign-off on completion (Part 3/3)
  6. WP submits supporting photos
  7. WP returns completed Gor.Or.2 to WG
  8. WG result summary (Part 4)

Need an assessment of your factory's waste?

Attach your company documents and waste details so our team can assess and quote faster.